Our Projects

Summary of completed and ongoing projects executed with technical partners across the oil and gas industry

19
Total Projects
6
Ongoing Projects
13
Completed Projects

Ongoing Projects

TOTALENERGIES EP (NIG) LTD

2-YEARLY PREVENTIVE MAINTENANCE & INSPECTION OF FSO UNITY TURRET AND AMENAM CALM BUOY AT OML 100

ONGOING

CHEVRON NIGERIA LIMITED

ENGINEERING DESIGN, PROCUREMENT, FABRICATION & SUPPLY OF WATER TREATMENT PLANT FOR GBAGADA FACILITY

ONGOING

CHEVRON NIGERIA LIMITED

PROVISION OF CALIBRATION SERVICES FOR STORAGE TANKS, FLOW METERS AND ANCILLARY MEASUREMENT EQUIPMENT

ONGOING

CHEVRON NIGERIA LIMITED

DEEPWATER LIFE EXTENSION STUDY FOR AGBAMI BUOY – PHASE TWO (ONSITE INSPECTION)

ONGOING

TOTALENERGIES EP (NIG) LTD

PROCUREMENT AND LABORATORY ANALYSIS OF GREASE SAMPLES FOR FSO UNITY TURRET AND CALM BUOY, OML 100.

ONGOING

TOTALENERGIES EP (NIG) LTD

LIFE EXTENSION AND DRY DOCKING OF CALM BUOY FOR TOTALENERGIES, OML 100

ONGOING

Completed Projects

FIRST E & P

ENGINEERING, PROCUREMENT, CONSTRUCTION, INSTALLATION AND COMMISSIONING OF SUBSEA UMBILICAL, RISERS AND FLOWLINES (SURF) FOR OML 83 & 85

COMPLETED

TOTALENERGIES EP (NIG) LTD

REPLACEMENT OF MRB DUST SEAL ON FSO UNITY TURRET, OML 100

COMPLETED

TOTALENERGIES EP (NIG) LTD

PROCUREMENT OF CHAFE CHAIN: 1XHAWSER HOOK LINK: 115X748X260MM 1 XADAPTOR LINK C/W HOOK ADAPTOR (500MM) 1XSPECIAL END LINK 95X130X370 1 XENLARGE LINKS: 560MM 21 XCOMMON LINKS: 76MM 1 XENLARGE LINK 1XSPECIAL END LINK 95X130X370MM

COMPLETED

CHEVRON NIGERIA LIMITED

AGBAMI DW LIFE EXTENSION ASSESSMENT PROGRAM- EXPORT BUOY STAGE ONE (INSPECTION & PRE-ENGINEERING STUDY FOR LIFE EXTENSION OF 20 YEARS)

COMPLETED

PLATFORM PETROLEUM

PROCUREMENT & INSTALLATION OF ELECTRONIC GAS FLOW METERS AND BARTON CHART RECORDERS AS CHECK METERS ON THE EGBAOMA – OB3 PIPELINE PROJECT

COMPLETED

TOTALENERGIES EP (NIG) LTD

ENGINEERING, PROCUREMENT, INSTALLATION & COMMISSIONING OF LV SWIVELS FOR FSO UNITY TURRET, OML 100.

COMPLETED

TOTALENERGIES EP (NIG) LTD

FLUID TRANSFER SYSTEMS, LOADING AND OFFLOADING STATIONS, HOSE REEL SYSTEM FOR FSO UNITY

COMPLETED

CHEVRON NIGERIA LIMITED

ENGINEERING, DESIGN, PROCUREMENT & SUPPLY OF WATER TREATMENT PLANT FOR GBAGADA FACILITY

COMPLETED

CHEVRON NIGERIA LIMITED

PROCUREMENT OF MOORING BRIDLE ASSEMBLY FOR AGBAMI FPSO

COMPLETED

CHEVRON NIGERIA LIMITED

CONSTRUCTION AND INSTALLATION OF PIPELINES AND FLOWLINES IN CHEVRON LAND AND SWAMP AREAS.

COMPLETED

AFREN PLC

ENGINEERING, FABRICATION & INSTALLATION OF WELLHEAD CONTROL PANEL

COMPLETED

CHEVRON NIGERIA LIMITED

PROVISION OF PERSONNEL AND EQUIPMENT FOR PENNINGTON SPM ALPHA BUOY REFURBISHMENT

COMPLETED

TOTALENERGIES EP (NIG) LTD

PROCUREMENT, LOADING AND OFFLOADING OF HOSE REEL FOR EGINA FPSO

COMPLETED